Pedestrian Bridges

Armstrong Avenue Pedestrian Bridge

The Armstrong Avenue pedestrian bridge will connect Tustin Legacy Park Phase 1 and 2. The bridge features a concrete edge girder with wood accents and lighting. Terraced planters will also help to set the bridge back from Armstrong Avenue. 

The Armstrong Avenue pedestrian bridge is currently scheduled to begin construction in Q2 2025, after the mounding for the bridge has been constructed and had sufficient time to settle, 

  1. 1
  2. 2
  3. 3

Future Pedestrian Bridges

Future pedestrian bridges are planned over major arterials such as Warner Avenue, Tustin ranch road and Edinger Avenue. These bridges will be designed and constructed as development advances at Tustin Legacy.